The new harbour will be ready by the end of 2016; the planning includes a new larger structure for the greatest safety, both while boats are moving or stationary. There will be a separated area where tenders will moor for maintenance or to be available for the mother ship.
The works are by Lotti Shipyard, equipped with very modern supplies,advanced technologies and skilled staff; with a 160-ton travel lift, it can satisfy the needs of any boat and make any kind of work, from hauling, joinery, painting to vintage boats’ refitting, in the respect of the original design.
So, the harbour confirms its 5-star standard certified by RINA, which awarded Porto Lotti as the best “MaRina Excellence” harbour in 2013, as a prove of the high quality services and the environmental sustainability of the entire structure.